Distributed Generation Rate

Distributed Generation Special Conditions

Customer must apply for and execute an interconnection agreement with the District prior to interconnecting any generation resource. Customer must comply with all applicable rules in the District’s Service Policy for interconnection of behind-the-meter generators.

Distributed Generation Rate

The entire territory of LMUD.

Facility Charge

  • Per meter, per month
  • As per Base Rate Schedule (adjusted 2/15)

Commodity Charge

  • All kilowatt-hour (kWh) received, per kWh
  • As per Base Rate Schedule

Reimbursement Credit

  • All kWh exported, per kWh
  • $0.10 per kWh
Distributed Generation Applicability

This schedule is applicable to all electric service locations that have permanently installed distributed generation on the customer side of the meter and where the customer does not qualify for net-metering under the policies of the District. This rate schedule will work in conjunction with the rate schedule that would normally apply to the customer in the absence of distributed generation (hereinafter referred to as the Base Rate Schedule).

Under this rate schedule, all electricity exported through the LMUD revenue meter will be tracked separately and credited to the customer’s account at the Avoided Cost Rate established by the District’s Board of Directors in Resolution 2011-05, or as amended from time to time.