Service & Line Extension Fees

General Information

For:

  • Single-family residential (400 amp panel or less)
  • Multi-family residential (200 amp termination section or less)
  • Small commercial (200 amp termination section or less)

Note:

  1. All panel installations larger than those listed and/or installations requiring materials other than LMUD’S standard installation materials will require a separate material cost to be prepared.
  2. All overhead secondary and/or service overhead connections requiring transformer installations shall, in addition to the below charges, be charged for equipment and labor.
Miscellaneous
  • Street and area light conductor (overhead and underground): $2 per circuit foot
  • Area light 100-watt: $250 flat fee
  • Area light 200-watt: $275 flat fee
  • Wood pole installation: $360 flat fee
Underground
  • Primary:
    • Single-phase: $16 per circuit foot
    • Three-phase: $19 per circuit foot
  • Secondary:
    • Single-phase: $7.50 per circuit foot
    • Three-phase: $7.50 per circuit foot
  • Service cable and connection:
    • Single-phase: $7.50 flat fee
    • Three-phase: $7.50 flat fee

Temporary service connection: $150 flat fee

Overhead
  • Primary:
    • Single-phase: $14 per circuit foot
    • Three-phase: $15 per circuit foot
  • Secondary:
    • Single-phase: $6 per circuit foot
    • Three-phase: $6 per circuit foot
  • Service drop and connection:
    • Single-phase: $165 flat fee
    • Three-phase: $165 flat fee

Temporary service connection: $350 flat fee